| Slide Rail System helps contractor shore excavation, install manholes on steep slope |
|
–By James McRay, Efficiency Production, Inc. |
|
Conestoga-Rovers & Associates (CRA) of The shopping center was built atop a retired The new manholes were installed to access The six manhole structures were installed at Traditional Shoring not an option on Efficiency Production helps contractor Efficiency’s Slide Rail Systems Manager, “Dig and Push” system fits in tight spots and steep slopes Slide Rail is installed simultaneously as the trench or pit is excavated by sliding the panels into integrated rails on the posts–an outside slotted rail first, then an open-face rail on the inside–then pushing the panels and posts incrementally down to grade as the pit is dug, a process commonly referred to as a “dig and push” system. Efficiency Production is the only Slide Rail manufacturer to offer an open-face rail design on their Slide Rail posts. “I like the (Slide Rail) System a lot, especially the open-face rail design,” said Leach, a second-time user of Slide Rail. “After installing 12 ft in the outside rail, it gets tight; but then moving to the open-face inside rail, it’s like starting all over again. There is a lot more flexibility.” CRA rented from Efficiency a four-sided system, utilizing a set of 12 x 12 feet long panels and 24 foot corner posts to install the four manholes with the shallower 12-13 foot grade. On the deeper 25 foot deep manhole installs, CRA swapped in 28 foot corner posts, and a set of 16 foot panels on two sides of the 4-sided system. “We soon discovered one of the advantages of Slide Rail: it can be installed easily on a sharp slopping hill by adding a panel on the high side, and leaving out a panel on the low side,” said Leach. The manholes were precast sections with a 60 inch inside-diameter. “I’ve been surprised at how quickly and easily it is installed and removed,” concluded Leach. “I don’t think it would be as easy with another type of (shoring) system. Contractor uses specialized excavator Conestoga-Rovers & Associates provides comprehensive engineering, environmental consulting, construction, and information technology solutions for a variety of contractors. With more than 30 years of experience in providing high quality and responsive services, CRA has grown to over 90 offices and more than 2,700 people working on projects worldwide. Efficiency Production, Inc., “America’s Trench Box Builder™,” provides the widest selection of standard and custom trench shielding and shoring systems. Efficiency’s versatile products are designed specifically for safe and cost effective installation of utility systems and infrastructure improvements. All products are P.E. certified to meet OSHA and MIOSHA standards. (Editor's Note: James McRay is the Director of Marketing & Media for Efficiency Production, Inc. He can be reached at 800-552-8800, or e-mail :jmcray@efficiencyproduction.com) |
|
| 0409 | |
| Return to Current and Archived Special Features | |
![]() |
| “We soon discovered one of the advantages of Slide Rail: it can be installed easily on a sharp slopping hill by adding a panel on the high side, and leaving out a panel on the low side,” said Larry Leach, CRA Project Manager. |
![]() |
| The CRA crew are (back row, l to r): Wess Ortell, Paul Conrod, Jon Mixner, Larry Leach; (front row, l to r) Trevor Harris, Steve McLean, and Scott Alexander, Jr. |
![]() |
| Slide Rail is installed simultaneously as the trench or pit is excavated by sliding the panels into integrated rails on the posts–an outside slotted rail first, then an open-face rail on the inside–then pushing the panels and posts incrementally down to grade as the pit is dug – a process commonly referred to as a “dig and push” system. |
![]() |
![]() |
![]() |
![]() |
![]() |
||||
![]() |
![]() |
![]() |
![]() |
|||||
![]() |
![]() |
![]() |
![]() |
|||||
![]() |
![]() |
![]() |
![]() |
![]() |
||||
![]() |
![]() |
![]() |
![]() |
![]() |
||||
![]() |
![]() |
![]() |
![]() |
![]() |
||||
![]() |
![]() |
![]() |
![]() |
![]() |
||||